Installation of a production line in Venezuela
Installation of a new production line with a capacity of 4.55 tonnes per hour. The entire installation was completed with local employees, who we trained for the installation, as well as ensuring the implementation of the quality and security of the construction site according to European standards.
The following plant components were incorporated into the new plant construction of a production line:
5 silo compartments (6 m³ each), 1 mixer, 1 pre-refiner, 5 new rolling mills, 2 single-shaft conches, 2 160 kW temperature controls for steam and water, 2 steel belts, 1 crossbelt, 1 fill including compressor and conveyor line. The heaviest main machine that was installed weighed 10 tonnes.